Kamm Consulting performs building/facility assessments for a broad range of purposes. Due diligence for real-estate transactions, feasibility studies for owner assessments are a few examples. The reports are an important part of the real-estate investment and business planning process.
Evaluate existing HVAC and mechanical systems for a 44,000 sf clubhouse.
Investigation of mechanical, electrical, plumbing, and life safety systems in Main Office Building consisting of 6 floors, 215,945 sf with a 227,260 sf garage, the Tech Center Building with 48,862 sf, and the BKU Building consisting of 29,271 sf of offices, training rooms, classrooms and test kitchens.
Status of existing mechanical, electrical, plumbing, and fire alarm conditions for a 20,000 sf clubhouse.
Condition of existing mechanical, electrical, plumbing, and fire alarm systems of a 16,000 sf clubhouse.
Building evaluation and observation of mechanical, electrical, plumbing, and fire sprinkler systems in 5-story 122,000 sf and 3-story 38,000 sf buildings.
Evaluation of mechanical systems involving the outside air supply.
Investigation to determine existing electrical power capacity, generator capacity, fire sprinkler capacity, potable water and sanitary capacities for 10,000 sf addition.
Study of mechanical, electrical, plumbing, fire alarm, and fire sprinkler systems in a 2-story, 12,000 sf clubhouse.
Inspection of electrical systems of building #22.
Status of existing mechanical, electrical, plumbing, and fire sprinkler conditions in a 2-story, 55,000 sf clubhouse.
Status of existing mechanical, electrical and plumbing conditions of first floor with intent to convert a 2-story, 41,983 sf office building into a multi-tenant building.
Evaluation of mechanical and electrical conditions to replace building chiller systems.
Investigate air conditioning systems and recommend increasing air conditioning performance.
Needs assessment evaluation of expansion of consolidation of data centers in medical division.
Evaluation of mechanical systems on the 2nd floor of the 10,000 sf building.
Observation of HVAC and electrical systems in battery room of switch center.
Building observation of HVAC system for code violations and investigation of chilled water systems and recommendations for 6-story building.
Building observation of mechanical, electrical, plumbing, fire alarm, and life safety systems to convert apartments into college dormitories.
Examination of HVAC system installation for a 4-story 93,000 sf multi-tenant office building.
Feasibility study to evaluate adding 500 sf computer room of first floor tenant to existing emergency generator in a 2-story, 11,000 sf building.
Site observation of existing mechanical, electrical and plumbing conditions of building systems.
Establish design criteria for mechanical, electrical, plumbing, and site lighting systems for 12,000 sf building.
Building observation of HVAC, electrical, plumbing, site lighting, and life safety systems in 37,775 sf building.
8-story Hotel, Hollywood-Fort Lauderdale Airport, Florida
Investigation of mechanical, electrical, plumbing, and life safety systems in building.
Study of mechanical and electrical systems providing the protective cooling source for emergency generator.
Evaluation of mechanical, electrical, plumbing and life safety systems of 100,000 sf building.
Feasibility analysis of possible conversion to data center in three buildings totaling 550,000+ square feet. Coordination study of electrical systems involving fault current and circuit analysis. Electrical and mechanical as-built drawings for facilities.
Status of existing mechanical and electrical systems in an 8-story, 212,500 sf base building and tenant spaces, recommendation for upgrading or installing new systems to meet the intended new use of building.
Building investigation of mechanical, electrical, plumbing, fire alarm, and fire sprinkler conditions in a 2-story, 140,000 sf building with recommendations for multi-tenant use.
Building observation of mechanical, electrical, plumbing, and fire sprinkler conditions of 5-story 61,000 sf office building and establish design criteria.
5-story, 52,000 sf building conditions of mechanical, electrical, plumbing, fire alarm and fire sprinkler systems.
Status of existing mechanical, electrical, plumbing, fire alarm, and fire sprinkler conditions of 17,000 sf golf clubhouse.
Building observation of mechanical, electrical, plumbing, and fire sprinkler conditions for a 2-story, 32,000 sf structure.
Existing conditions of mechanical and condenser water systems of a 32-story apartment building with adjacent 3-story parking garage.
Observation of mechanical, electrical, plumbing, and fire sprinkler systems and building conditions in 36,250 sf building and 63,400 sf parking garage.
Condition of existing mechanical and electrical systems.
Analysis of mechanical system involving air conditioning systems.
Status of mechanical, electrical and plumbing conditions of building.
Survey and evaluation of electrical and mechanical systems of building.
Building observation of mechanical, electrical, plumbing and life safety systems of 7,000 sf dialysis center.
Feasibility study to upgrade or replace well-based condenser water system with cooling tower.
Building observation of existing mechanical, electrical and plumbing conditions of office warehouse.
Evaluation of existing conditions of mechanical, electrical and plumbing systems in 4,000 sf restaurant.
Status of existing mechanical, electrical and plumbing conditions.
Analysis of mechanical systems and air conditioning performance.
Investigation of fire protection systems and fire barriers.
Evaluation of potable water systems.
Investigation of generator installation, noise and odor levels.
Status of electrical systems in building.
Feasibility and design criteria of installing two electrical utility feeds.
Building observation of electrical systems for a data center.
Evaluation of mechanical, electrical and plumbing conditions in 7,000 sf restaurant located in a 12-story building.
Network Plus @ Telecom Hotel, Miami, Florida
Feasibility study of 2-story, 37,000 sf building for use as a school. Examination and evaluation of electrical, mechanical, fire alarm, and fire sprinkler systems in offices, mechanical/electrical equipment rooms, computer rooms and facilities support rooms.
Review of construction documents and specifications.
Status of mechanical, electrical and plumbing conditions in restaurant.
Building observation of HVAC systems in 5,000 sf building consisting of laboratories and offices.
Building observation of code violations of HVAC system, study of chilled water system and recommendations.
Condition of existing mechanical, electrical, plumbing and fire sprinkler systems of 165,000 sf retail/warehouse building.
Investigation of energy consumption and calculations of power consumed by electrical systems in building.
Evaluation of air conditioning system.
Evaluation of existing data center.
Site investigation of mechanical, electrical and plumbing conditions of existing building systems in 8,900 sf laboratory.
Site survey and evaluation of condition of HVAC systems with emphasis on ductwork location of fire dampers.
Site observation of electrical systems and code violations.
Building Observation of electrical services for 150,500 sf retail complex
Investigation of HVAC systems in building.
Study and evaluation of the electrical distribution in office building.
Building observation of electrical, mechanical and fire alarm systems in 101,803 sf office building.
Evaluation of mechanical and electrical systems in 5,000 sf office building with computer equipment room.
Building investigation of electrical, HVAC and life safety systems of three offices to ensure the electrical power and air conditioning capacities were adequate.
Investigation of the plumbing system and building conditions to evaluate any code violations.
Feasibility study of relocation possibility of 800 sf building. Evaluation of the mechanical, electrical and plumbing systems and recommendations for new site preparation and reconnection and installation of systems.
Study of mechanical, electrical, plumbing, fire alarm, and fire sprinkler systems in 1,300 sf tennis pavilion and 34,075 sf clubhouse.
Evaluation of mechanical and HVAC systems on the 5th and 2nd floors for a software company.
Evaluation of 12-year old, multi-building school campus to evaluation the HVAC and mechanical systems for indoor air quality problems.
Study of the conditions of the electrical, mechanical, fire sprinkler, and plumbing systems in a 6-story, 82,000 sf building consisting of a bank and offices.
Evaluation of the electrical systems of a 12-story office building especially the telecom/network system
Examination of electrical system to determine possibility of expanding existing office space.
Evaluation of emergency systems and electrical conditions for 70,000 sf, 3-story office building.
Examination and evaluation of electrical, mechanical, plumbing, fire alarm and fire sprinkler systems and architectural conditions for 3-story 48,000 sf office building, 24,000 sf parking garage, and a 13,140 sf office building.
Evaluation of the controls for air conditioning system and recommendations of better methods to monitor and control energy consumption for a 3-story, 60,000 sf building.
Status of plumbing, fire sprinkler and electrical conditions and evaluation of building conditions for:
Building 1 73,849 sf Office/warehouse
Building 2 54,608 sf Office/warehouse
Building 3 72,100 sf Office/warehouse
Building 4 65,469 sf Office/warehouse
Building 5 58,046 sf Office/warehouse
Building 6 South 41,261 sf Office/warehouse
Building 6 North 41,261 sf Office/warehouse